Contract Details

National Highways Strategic Safety Team in the Road Safety Division want to procure through the SPaTS 3 framework a Direct Award to WSP for the continued development of Lead Safety Indicators (LSIs) project (T0631) through a re validating and verification stage. In the National Highways 2024-25 annual delivery plan we committed to developing a set of LSIs. ORR is following progress on this. It is understood that DfT is expecting at least one lead safety indicator (in addition to the existing iRAP metric) to be added to our formal organisational performance metrics during RIS3. National Highways' key performance indicator for road user safety on the Strategic Road Network (SRN) (KPI1) is a lagging indicator, focused on impacts. A lagging indicator is reactive in nature and measures the performance of an aspiration or outcome after an event has occurred. They don't tell us how we're performing at preventing casualties and reducing future collision severity. There is also a time lag of knowing the results of a lagging indicator, for example, 2024 stats 19 data was published on 25 September 2025. Although measurable and quantifiable, lagging indicators alone are not enough, and they don't provide insight into factors that lead to those outcomes without in-depth analysis. LSIs are proactive, preventive measures (or metrics) used to shed light on the level of safety performance achieved in a system through monitoring and intervention. A lead indicator attempts to measure control and preventative activities that precede or indicate likely failures. They are designed to understand what is happening earlier in the process in order to prevent and control lagging indicators. Therefore, to improve road safety on the SRN (and reduce KSIs), there is a need to identify, monitor and positively influence LSIs. Our iRAP performance indicator (percentage of traffic using iRAP 3 star or above rated roads, and flow-weighted decimal star rating) is a lead indicator, but as we are only able to conduct a full survey once every 5 years, we need additional measures that can provide earlier and more frequent indication of safety performance and therefore any need for change in approach or additional intervention within the 5 year period.

Scope of Works

This contract has been awarded to WSP UK LTD by National Highways Limited in the United Kingdom. The contract is valued at £99,857 and falls under the Infrastructure sector.

Contract awarded to WSP UK LTD — Value: £99,857 — Authority: National Highways Limited.

About This Award

This contract award was published on 03 August 2026 via Contracts Finder (UK). The contract has been awarded to WSP UK LTD, work with a reported value of £99,857, issued by National Highways Limited in United Kingdom.

Sector: Infrastructure

This award is classified under Infrastructure. ContractAwarded.com tracks procurement awards across all major sectors, sourcing data daily from official UK and EU government portals, trade publications and global news feeds.